MSBA Lloyd G. Blanchard Middle School Roof Replacement

MSBA Lloyd G. Blanchard Middle School Roof Replacement

MSBA Lloyd G. Blanchard Middle School Roof Replacement

Westford, MA

Currently on the boards, this project consists of the replacing of all exisiting PVC roofs at Lloyd G. Blanchard Middle School. The school is comprised of twelve different roof levels all in need of replacement. Photos on the right capture the sites exisitng conditions.

MSBA Amigos School Roof Replacement

MSBA Amigos School Roof Replacement

MSBA Amigos School Roof Replacement

Cambridge, MA

Currently on the boards, this project is working to replace the existing gravel ballasted EPDM roofs with a new TPO membrane roof. The images to the right provide a look at the existing conditions of both the school and gymnasim roof to be replaced. 

UMD Charlton College of Business Building Envelope Repairs

UMD Charlton College of Business Building Envelope Repairs

Charlton College of Business Building Envelope Repairs 

University of Massachusetts Dartmouth

Dartmouth, MA

This study looks at the envelope of the original section of the Charlton College of Business building, including the EPDM roof and the aluminum frame windows. Improper construction detailing at the second and third floor windows and curtain walls has led to water infiltration and caused interior damage. This study includes options for the repair or replacement of the exterior cladding systems and roofing, including rooftop units and fenestrations. 

Fall River Fire Museum

Fall River Fire Museum

Fall River Fire Museum

Fall River, MA

This project focuses on the Fall River Fire Museum located in the historic Anawan No. 6 station. The scope of work regards the design for the replacement of the existing asphalt room with a new system and partial repointing of the Hose Tower and Chimney for areas above the roofline. The new system will be an asphalt system, similar to the existing. 

Fall River Arts Association

Fall River Arts Association

Greater Fall River Arts Association

Fall River, MA

This project works in line with the goals of the Fall River Master Plan  to “preserve and enhance historic resources” as well as “assist non-profits in preserving their structure”. The main efforts being the addition of a new accessible entrance, new exterior stairs, and a new accessible toilet room, as well as the restoration of 12 windows in drastic states of deterioration.

The work done by Civitects will be a continuation of the restoration efforts that the Art Association has akready begin to maintain and protect the historic character of the building. This work includes refinishing the original wood floors, repairing original bookcases, restoring the stained glass windows, and the organization of a “Spindles and Columns” fundraiser to aid the restoration of the porch.