Attleboro Biology Lab Renovations

Bristol Community College

Attleboro, MA

The renovation of an existing
classroom into a new Biology Lab
included accommodations for a new
built-in instructor’s table and lab
benches designed to accommodate 24
students. Our work included
preparation of alternate layouts for
review by faculty and staff during the
Schematic Design Phase in order to
determine the optimal layout for both
teaching and laboratory instruction as
well as the number of student stations
that could be accommodated within the
space.

The project was bid during the spring to
accommodate long lead times required
for laboratory casework. Construction
occurred during the summer while the
remainder of the building was occupied
for summer classes by both students
and faculty. The project was
successfully completed in time for the
start of the fall semester.