MSBA Veteran’s Memorial High School Roof Replacement
Peabody, MA
At thirty-years old, the existing 4-ply BUR roof system was approaching the end of its useful life. A new EDPM system was installed to match similar roof replacements elsewhere at the building. Modifications included the raising of HVAC curbs where required; plumbing vent extensions and the relocation of plumbing vents that were too close to existing to remain RTU’s; replacement of the lighting protection system at areas of work and new guardrails at existing courtyards.