MMA Natatorium

MMA Natatorium

Natatorium Renovation

Massachusetts Maritime Academy

Phase I: Demolition and removal of existing ACT ceiling and fixtures; repair and painting of existing ceiling and walls; and new lighting system.

Phase II: New acoustic wall panels.

MMA Lockerroom

MMA Lockerroom

Gymnasium Locker Room Renovation

Massachusetts Maritime Academy

This project included renovation of existing aerobics space to accommodate four new locker rooms and two new shower/rest rooms. Also included is the renovation of a former rifle range into a new training and rehab facility.

 

MMA Grandstands

MMA Grandstands

Grandstands

Massachusetts Maritime Academy

The Grandstands at Massachusetts Maritime Academy’s Clean Harbors Stadium were completed by Civitects in 2010

 

 

Fall River YMCA

Fall River YMCA

Fall River YMCA Comprehensive Renovation

Fall River, MA

The goal of this project was a comprehensive renovation to the YMCA’s existing facilities in Fall River. The original building was built in various phases between 1898 and 1964. For this reason special attention had to be given to resolving issues related to varying floor and ceiling heights between the different structures, while also providing a new addition to the northeast corner of the building, including an elevator and connection to the existing natatorium. Two supplementary full-height stair cases were also required within the main building in order to provide proper egress.

 

UMD Textile Building Bioengineering Teaching Laboratory

UMD Textile Building Bioengineering Teaching Laboratory

Textile Bioengineering Teaching Laboratory

University of Massachusetts Dartmouth

Dartmouth, MA

This project was part of a multi-phased renovation to the existing lab spaces in Umass’ Textile Building. This phase of the project included a pair of teaching labs (for both “wet” and “dry” experiments) and a portion of the surrounding support spaces, for both current and future use. Due to the phased nature of the project careful consideration had to be given when planning the spaces in order to avoid redundant or unnecessary work in future phases. Additionally the support spaces were planned in order to allow use by both the current and future labs planned for the space.

Phase II