BSU – Rondileau Campus Center Ballroom Renovation

BSU – Rondileau Campus Center Ballroom Renovation

BSU Rondileau Campus Center Ballroom Renovation 

Bridgewater, MA

This space, originally constructed in 1967, consists of a tiered demonstration room into a small ballroom as well as an extension to an adjacent larger ballroom separated with movable partition walls. The work of this project included the renovation of the demonstration room to accommodate the small ballroom space, which could be used as a stand-alone space or in conjunction with the larger ballroom. In addition to these renovations, this project also included the upgrading of the ballrooms sound system, fire-alarm system, and the installation of a new sprinkler branch line.

BSU Cyber Range

BSU Cyber Range

Cyber Range

Bridgewater State University

Bridgewater, MA

To meet the evolving and increasingly complex demands the world faces with cyber-attacks, Bridgewater State University has embarked on the development of a new program of study in the field of Cyber Security.

Over two years in the making, the Cyber Range consists of a series of spaces that will provide individuals with critical training in the rapidly growing field of cybersecurity and how to respond to potentially devastating cyberattacks. The range is designed to heighten user’s emotional response through lighting, sound effects, and vibrating chairs and tables, creating a unique sensory experience within a high tech setting. Programmatic spaces include the new Cyber Range equipped with advanced AV technology and software intended to provide an interactive experience, as well as a new Control Room, Briefing Room and Reception space. 

NBC10 Boston recently visited Bridgewater State University for an inside look at this state-of-the-art facility. Click Here to view the clip and article featuring the new space.

BSU Bear’s Den Kitchen Renovation

BSU Bear’s Den Kitchen Renovation

Bear’s Den Kitchen Renovation

Rondileau Student Union – Bridgewater State University

Renovation of existing kitchen including installation of new kitchen equipment and associated MEP-FP Upgrades. Schematic Design – Closeout phase services were provided. Systems included, not limited to, Fire Protection systems design included modifications to the existing automatic
combination standpipe/sprinkler system to protect the renovated work areas 100%; fire alarm devices such as pressure and flow switches, air compressor for dry
sprinkler system, finned tube radiation; horizontal and cabinet type unit heaters; roof fans and hoods; atc/energy management system, and ductwork balancing, domestic water systems and sanitary systems.

BSU Window Replacement Phase I & II

BSU Window Replacement Phase I & II

Window Replacement Phase I & II

Bridgewater State University

 

BSU Campus Center Main Entrance

BSU Campus Center Main Entrance

Campus Center Entrance Renovation

Bridgewater State University

Originally designed prior to the enactment of the ADA, one of the prime goals of the project was to provide easy and direct handicapped access to both venues. Additional goals of the project included consideration of program revisions to better respond to current uses and improve general curb appeal.

The revisions to the Campus Center Main Entrance include an open and flexible plan that will serve as a link between East and West Campuses with various digital media upgrades.